Another Winter Warning...
...and, yes, the snow has begun.
The two dinghy side panels have been faired and drilled. The drilling—itty-bitty holes every 4 inches along the edge—are for the copper wire stitches that will hold things together until the epoxy/fiberglass takes over. When the drilling was done, the logical next step was lofting one of the bottom panels.
If I cut and fair it, and it’s twin, tomorrow, along with the two transoms, it will be stitching time.